The Wild Way · Our project process
Selective Demolition
We focus on controlled work, protecting areas that remain and keeping debris removal organized.
1. PPE & jobsite safety
- Hard hats where overhead hazards exist, safety glasses, sturdy gloves, protective footwear and hearing protection.
- Hazard-assessed respiratory protection; extra precautions for silica, asbestos, lead and other regulated materials.
2. How we prepare and set up the job
Family-oriented jobsite setup: we review occupied rooms, children and pets, access routes, work hours, dust barriers and where materials will be staged. We explain what will be disrupted before the work starts, and keep affected areas separated from household activity when practicable.
- Setup step 1Walk the site and identify load-bearing elements, adjacent finishes and areas to remain.
- Setup step 2Arrange utility isolation, required permits and any hazardous-material assessments before work.
- Setup step 3Plan containment, signage, safe access, debris routes and equipment exclusion zones.
- Setup step 4Review structural support needs with qualified professionals before disturbing load-bearing components.
3. Step-by-step work process
- 1
Prepare and isolate
Protect occupied or unaffected areas, verify required disconnections, and establish safe work boundaries.
- 2
Controlled removal
Remove agreed materials in a planned order without disturbing protected structure or utilities.
- 3
Material handling
Segregate recyclables, regulated waste and general debris for lawful disposal.
- 4
Ready for rebuild
Remove remaining loose debris and identify any discovered conditions requiring a change to scope.
4. Cleanup, quality check & walkthrough
- Remove job debris and protective coverings safely, leaving agreed areas broom-clean.
- Inspect completed work, discuss any punch-list items, and review care or maintenance guidance.
- Complete applicable inspections and a customer walkthrough before final sign-off.
Ready to plan your selective demolition project?
Photos, the material to remove, approximate size and accessibility help us assess the demolition scope.
